`excessDataGas` has been partially made eip-4844 ready, so instead of
passing nils to functions, now it actually assigned to some value (it is
expected to be nil until cancun update).
when assigning default bor parameters, need to make sure config exists
first. since not sending the config will result in it being nil, not the
empty struct.
it would appear that an extra `e` was added somewhere along the way to
the cli flags for txpool. If this was intentional I was curious as to
why, otherwise it seems like fixing the flag would remedy some
confusion. Thank you
Upon further investigation it would appear
https://github.com/ledgerwatch/erigon/blob/devel/cmd/utils/flags.go#L173
shows corrected spelling.
Separate:
- new tasks coming by channel with limited capacity (touching the limit
will block - like sync.Cond.Wait() does, but composable). as a result -
don't need track queue size (it will not increase conflict-rate).
- re-exec tasks are going to priority-queue (which is also higher
priority than 1-st `chan`).
This PR completes the implementation of `eth_getProof` by adding support
for storage proofs.
Because storage proofs are potentially overlapping, the existing
strategy of simply aggregating all proofs together into a single result
was challenging. Instead, this commit rewires things to introduce a
ProofRetainer, which aggregates proofs and their corresponding nibble
encoded paths in the trie. Once all of the proofs have been aggregated,
the caller requests the proof result, which then iterates over the
aggregated proofs, placing each into the relevant proof array into the
result.
Although there are tests for `eth_getProof` as an RPC and for the new
`ProofRetainer` code, the code coverage for the proof generation over
complex tries is lacking. But, since this is not a new problem I'll plan
to follow up this PR with an additional one adding more coverage into
`turbo/trie`.
---------
Co-authored-by: Jason Yellick <jason@enya.ai>
## Changelog
Fixed the following Grafana panels:
* DB Size
* GC and State
* DB Pages Ops/sec
* Commit Counters
* Getrusage
* Latest Block
Also partially fixes https://github.com/ledgerwatch/erigon/issues/7226
@shyba hi, seems this lib doesn't work with
ghcr.io/goreleaser/goreleaser-cross (which producing release binaries)
removing it for now, feel free to add it in future - if can make it work
with goreleaser-cross
see: https://github.com/ledgerwatch/erigon/issues/7210
- Fix tx numbers expected
- Check for baseFee subpool size too
- Fix tx counting
- Wait for blocks in baseFee subpool to be promoted and mined
- Add BlockNumber request
Small change in core.NewEVMBlockContext and now it expects
excessDataGas. This will be used in state transition to compute data fee
for eip-4844 data blobs. The logic that computes it will be added in the
next PRs.
This PR contains very small EIP-4844 additions. GasPool is modified and
now it is a struct with 2 fields "gas" and "dataGas" (blobs are priced
in dataGas). ExcessDataGas block header field added. ExcessDataGas
needed to compute the data gas price. EIP-4844 helper functions are
added as well.