mirror of
https://gitlab.com/pulsechaincom/erigon-pulse.git
synced 2025-01-09 12:31:21 +00:00
80e29f29d3
This PR includes changes required for delhi hard fork schedule at block `29638656` on mumbai testnet. It changes few major parameters. 1. Sprint length - the number of bor blocks post which a new validator mines has been reduced from 64 to 16. 2. Block time - the block time which was increased earlier for some experiments to 5 seconds has been reduced to 2 seconds (along with backup multiplier and producer delay). 3. Base fee denominator - this fields has been increased from 8 to 16 to smoothen the effect of EIP 1559. |
||
---|---|---|
.. | ||
bor-devnet.json | ||
bor-mainnet.json | ||
bsc.json | ||
chapel.json | ||
chiado.json | ||
fermion.json | ||
gnosis.json | ||
goerli.json | ||
mainnet.json | ||
mumbai.json | ||
rialto.json | ||
rinkeby.json | ||
ropsten.json | ||
sepolia.json | ||
sokol.json |