* First take at updating everything to v5
* Patch gRPC gateway to use prysm v5
Fix patch
* Update go ssz
---------
Co-authored-by: Preston Van Loon <pvanloon@offchainlabs.com>
* Fix exported names that start with a package name
* A few more renames
* Fix exported names that start with a package name
* A few more renames
* Radek's feedback
* Fix conflict
* fix keymanager test
* Fix comments
---------
Co-authored-by: prylabs-bulldozer[bot] <58059840+prylabs-bulldozer[bot]@users.noreply.github.com>
* Aditya's PR 18
This PR implements PR18. There is still a missing piece which is
consistency of head with finalized checkpoint. I will think on ways to
enforce this.
* prune finalized incompatible
* don't check finalization on viable for head
* unit tests fixes
* gazelle
* remove finalized epoch from viableForHead
* remove finalized epoch from leadsToViableHead
* use non-slashed indices
* function rename
* lint fixes
* lint fixes
* lint fixes
* init
* unit test
* DeepSource complains
* gaz
* shutting deepsource down
* change var name and use handler type
* Kasey's name suggestion
* fix stategen
* interface signature
Co-authored-by: terencechain <terence@prysmaticlabs.com>
* replace eth2 types
* replace protos
* regen proto
* replace
* gaz
* deps
* amend
* regen proto
* mod
* gaz
* gaz
* ensure build
* ssz
* add dep
* no more eth2 types
* no more eth2
* remg
* all builds
* buidl
* tidy
* clean
* fmt
* val serv
* gaz
Co-authored-by: Preston Van Loon <preston@prysmaticlabs.com>
* Delete deploy contract tool. Move mock to its own package as testonly with some helper functions
* gofmt contracts/deposit/mock/mock.go
* move stategen mock.go to its on testonly pkg
* move password_reader_mock.go to mock testonly package
* move mock keymanager to its own testonly package
* move attestations mock
* move voluntaryexits mock
* Move slashings mock to mock pkg
* move the slasher mock
Co-authored-by: prylabs-bulldozer[bot] <58059840+prylabs-bulldozer[bot]@users.noreply.github.com>