* fatal if impossible to receive chainstart
* fix tests
* fix
* custom delay
* completed custom delay
* errors
* better logs, nothing at genesis
* use demo in val
* add gazelle
* log
* starting to log stuff
* pass in ops
* avoid printing the large #s for debug, still working on tests..
* all around better logging
* fixed build error in epoch process
* fixed state transiton tests
* fixed block tests
* lint
* verify sigs in randao
* ready for inclusion falg
* only print waiting when slot is not valid
* fix build
* mod config
* fixed last justified slot issue
* fix inclusion
* fixed attestation issue
* using zero hash from params instead
* fix tests
* update balance
* removed swp
* more `- genesis_slot` for logs
* rem unused log
* fix broken tests
* account for skip slots in state root computation
* fixes done
* validator guide bug fixes - 671
* epoch boundary at the last slot of the epoch
* fix epoch issue
* more balance cal logs for debugging
* greater balance
* attestaton fixes
* fixes
* addressed testrun
* fixed ejection balance
* fix tests with far future epoch
* revert sync change
* revert initial sync change
* fix changes
* off by one att fix
* revert the att fix
* address comments
* format
* fix build
* rem file
* clean up test
* adding test setup
* add chainstart check to sync querier
* goimports
* goimports
* backend cleanup
* adding getters
* lint
* moving to db
* gazelle
* adding more services setup
* adding more changes
* adding different test setups
* other merge issues
* imports
* fixing keys
* get intial sync able to be set up
* new changes and gazelle
* use simulated p2p
* everything finally works
* unexport fields
* revert changes from merge
* remove mock server
* add documentation
* gazelle
* add another node
* review comments
* fix tests
* move deposit input to keystore pkg, add proof of possession and withdrawal addr
* Add spec details for deposit input
* Use ssz
* actually use withdrawal key
* remove a few references that tie the validator binary to the go-ethereum crypto library
* fixes
* remove unused vars
* gazelle
* nosec on this crypto library
* correct attester view of chain head and prioritize proposer
* fix attempt not working
* revise with correct logic
* attester fixess to root fetching, spec did not make sense
* comments to match code
* fix attester responsibility
* comments
* begin using tree hash instead of hash for state and blocks
* replace with ssz
* rem references to vote cache
* replace all instances of state/block hash with root
* goimports
* almost every test in the world fails
* goimports
* all tests pass, tree hash across repo
* provide validator with real keystore public key
* fmt
* build errors buildkite
* readd imports removed by goimport
* gazelle
* address broken tests
* make reference to filename a param
* fmt
* imports
* gazelle
* os remove all
* Use better Temp storage for tests
* testmain approach to avoid repeating expensive operation for each test
* travis lint
* fix test
* nokeystore in status test
* passing
* fix goimports
* initial validator attesthead rewrite based on proposer rewrite
* proceed with fetching committees and tree hashing the canonical head at assigned attester slot
* complete filling the properties of attestation data and all associated root hashes
* add when to attest todo
* finish entire attester client logic
* tests with mocks checked in
* tests passing in client
* stubbed out server implementation
* fixed build due to old property
* regen mocks with new mockgen version
* fixed broken tests
* complete bazel build fix
* address some review comments
* deep proto test
* server implementation logic
* attestation info tests
* completed passing tests, tree hash still blocked by error with nil fields unfortunately
* fix todo failure
* gazelle rerun and master merge
* testing full behavior of attestation info server
* finished all required server tests and implementation
* break loop
* fix tests due to genesis slot updates
* initial validator attesthead rewrite based on proposer rewrite
* proceed with fetching committees and tree hashing the canonical head at assigned attester slot
* complete filling the properties of attestation data and all associated root hashes
* add when to attest todo
* finish entire attester client logic
* tests with mocks checked in
* tests passing in client
* stubbed out server implementation
* fixed build due to old property
* regen mocks with new mockgen version
* fixed broken tests
* complete bazel build fix
* address some review comments
* deep proto test
* tests passing after checking for empty committee and crosslink root
* address nishant comments
* WIP - with TODOs
* interface w/ test
* basic test for broadcast
* Add computeStateRoot funciton
* remove custody challenge
* resolve TODO lint issues
* more TODOs
* revert new line in types.proto
* broadcaster comment
* one of several failure condition tests
* Add test cases
* handle compute state error test case
* fix config in validator helpers
* fix tests too
* fix conflict
* partial PR feedback
* remove p2p
* gazelle
* package comment
* Better godoc
* tests passing once again in db package
* fixed all tests
* revert some weird p2p changes made accidentally
* fix repeated code
* build fixed
* fix p2p
* fix all tests
* Fix missing import
* force building of manual targets
* Revert "force building of manual targets"
This reverts commit ada170ffa9c3f3592122e6e48372c330e355ac3a.
* begin reorder
* move into beacon server
* add proposer server
* fix
* add proposer server
* wrap up rpc reorder
* eliminated deprecated RPC endpoints
* formatted nicely
* RPC protos
* fix lint
* integrate hash proto
* autoclean
* deprecate all old code
* include the rest of methods mocks
* bazel run
* lint fixes
* Add version linking to binaries via --workspace_status_command=./scripts/workspace_status.sh
* dont export some things
* lint and better date
* even better date
* /healthz part1
* lint, fix
* lints and todos
* add p2p status test
* Add test for service registry Statuses
* fix my fake errors for the linter
* Test healthz handler
* Run gazelle
* first commit, remote att types
* no more agg attestation proto
* regen mock
* only attestations
* proto
* att process
* fix att references
* more tests passing
* use att protos
* complete
* change visibility
* use gogoprotobu
* first commit, remote att types
* no more agg attestation proto
* regen mock
* only attestations
* proto
* att process
* fix att references
* more tests passing
* use att protos
* complete
* Update dependency com_github_deckarep_golang_set to v1 (#1159)
* Update dependency com_github_edsrzf_mmap_go to v1 (#1160)
* Update dependency com_github_go_stack_stack to v1 (#1161)
* Update dependency com_github_rs_cors to v1 (#1162)
* Update dependency in_gopkg_urfave_cli_v1 to v1 (#1163)
* change visibility
* Preliminary support for relay nodes
* lint
* Add comment, remove TODO
* work on relay address factory
* dial relay node, if available
* forgot new files
* fix service registry breakage
* added logging
* Added a peer count with prometheus
* always start mDNS
* fix lint
* Standardize params for BeaconChain and Validator projects
* gofmt
* various changes to bring up to standards
* lint
* linter 2, not sure why travis complains
* revert service_test.go
* start sequence for node to connect to bootstrap nodes
* lint
* maybe warning is more appropiate?
* fix gazelle
* preston's feedback
* add go-ipfs-addr to workspace
* move flag to shared
* removed routed host
* implementing basic proposer functionality
* checked in gomocks
* fix typo
* refactor using feeds
* use event feeds for assignment
* sending the latest beacon block over announcement chan
* 100 coverage, using feeds
* gazelle
* include parent hash from prev canonical block and slot number + 1
* including all other prop fields
* fix build
* proposer rpc method tests, implemented in beacon chain side
* godoc