* initial validator attesthead rewrite based on proposer rewrite
* proceed with fetching committees and tree hashing the canonical head at assigned attester slot
* complete filling the properties of attestation data and all associated root hashes
* add when to attest todo
* finish entire attester client logic
* tests with mocks checked in
* tests passing in client
* stubbed out server implementation
* fixed build due to old property
* regen mocks with new mockgen version
* fixed broken tests
* complete bazel build fix
* address some review comments
* deep proto test
* server implementation logic
* attestation info tests
* completed passing tests, tree hash still blocked by error with nil fields unfortunately
* fix todo failure
* gazelle rerun and master merge
* testing full behavior of attestation info server
* finished all required server tests and implementation
* break loop
* fix tests due to genesis slot updates
* fix bug in eth1 data vote count increases
* updating attester slashings
* is double vote and attester pseudocode
* attester slashing revamp complete
* exits processing complete
* all block operations aligned to spec
* completed test revamp
* builds properly
* all done FINALLY
* deprecate all instances of old randao logic
* fix all broken tests and cleanup randao references across repo
* builds but tests failing
* fixing broken chaintests
* only chaintests fail now
* randao fully updated
* add bls todo
* lint
* travis
* fix unresolved property in struct
* remove used randao var
* initial validator attesthead rewrite based on proposer rewrite
* proceed with fetching committees and tree hashing the canonical head at assigned attester slot
* complete filling the properties of attestation data and all associated root hashes
* add when to attest todo
* finish entire attester client logic
* tests with mocks checked in
* tests passing in client
* stubbed out server implementation
* fixed build due to old property
* regen mocks with new mockgen version
* fixed broken tests
* complete bazel build fix
* address some review comments
* deep proto test
* tests passing after checking for empty committee and crosslink root
* address nishant comments
* WIP - with TODOs
* interface w/ test
* basic test for broadcast
* Add computeStateRoot funciton
* remove custody challenge
* resolve TODO lint issues
* more TODOs
* revert new line in types.proto
* broadcaster comment
* one of several failure condition tests
* Add test cases
* handle compute state error test case
* fix config in validator helpers
* fix tests too
* fix conflict
* partial PR feedback
* remove p2p
* gazelle
* package comment
* Better godoc
* update proto fileds
* Start writing ProcessETH1Data function
* More progress on tests
* Continue more work on tests
* Fix almost all the tests
* Fix all tests
* Fix everything
* Fix after rebase
* Fix for suggestions and fix per-epoch operation
* Remove method usage
* Fix build
* Fix suggestions
* Fix merge issues and suggestions
* Fix rebase issues
* Remove the error from ProcessETH1Data
* WIP write test
* Update test to reach crosslinks
* Revert "Update test to reach crosslinks"
This reverts commit 5ff9177f96c12c98c54eafffcfb385bd966b0888.
* Revert "WIP write test"
This reverts commit f7e7ed715c4af6b7e3c95643f7ebf85830caf638.
* begin reorder
* move into beacon server
* add proposer server
* fix
* add proposer server
* wrap up rpc reorder
* eliminated deprecated RPC endpoints
* formatted nicely
* RPC protos
* fix lint
* integrate hash proto
* autoclean
* deprecate all old code
* include the rest of methods mocks
* bazel run
* lint fixes
* Begin renaming
* Missing goimports
* Continue rename
* Fix errors and mismatches
* Run proto script
* Fix proto
* Fix some more issues
* Fix tests
duh
* Fix goimports
* first commit, remote att types
* no more agg attestation proto
* regen mock
* only attestations
* proto
* att process
* fix att references
* more tests passing
* use att protos
* complete
* change visibility
* use gogoprotobu
* first commit, remote att types
* no more agg attestation proto
* regen mock
* only attestations
* proto
* att process
* fix att references
* more tests passing
* use att protos
* complete
* Update dependency com_github_deckarep_golang_set to v1 (#1159)
* Update dependency com_github_edsrzf_mmap_go to v1 (#1160)
* Update dependency com_github_go_stack_stack to v1 (#1161)
* Update dependency com_github_rs_cors to v1 (#1162)
* Update dependency in_gopkg_urfave_cli_v1 to v1 (#1163)
* change visibility